IT Planning for Building Renovations and Expansions

When a facility is renovated or expanded, technology is often treated as something to figure out once the walls are up. That is backwards. Running cable through an open ceiling costs a fraction of what it does afterward, and an undersized network closet is a problem you live with for decades. Bringing IT into the project early lets you build in what you need, instead of paying to work around what was left out.

Here are the main considerations to raise with your architect, contractor and technology partner.

Start with the plan, not the equipment

Ask your IT partner to review the drawings during design, not after. They can flag where network closets, outlets, wireless access points, cameras and nurse call devices should go. Share your operational plans too: how many workstations at each nursing station, where mobile carts will be used and whether any new services are planned.

Cabling

Structured cabling is the foundation. Points to consider:

Quantity. Install more data outlets than you need today. Adding drops later is expensive.

Quality. Use cable and components rated for current and future needs, installed by qualified technicians and tested and documented.

Locations. Plan outlets for workstations, printers, phones, wireless access points, cameras, door controls, televisions and any monitoring devices.

Pathways. Ensure conduit and cable trays are sized with room to grow.

Labeling. Every cable and port should be labeled consistently, with a map of the building.

Fiber. Consider fiber between closets or buildings for reliability and distance.

Network closets and server space

Each closet needs adequate space, ventilation or cooling, power and security. Plan for:

Enough floor and rack space for switches, firewalls and growth

Dedicated electrical circuits and backup power connections

Cooling suitable for the equipment inside

Locked access with a record of who enters

Protection from water, such as avoiding placement beneath plumbing

Distance limits, since copper cable runs have maximum lengths

Do not let the closet become shared storage for supplies.

Power

Technology depends on reliable power. Discuss with the electrical designer:

Uninterruptible power supplies for network gear and key systems

Which circuits connect to emergency generator power

Enough outlets at nursing stations, offices and charging areas for mobile carts

Surge protection

For healthcare facilities, confirm how emergency power affects networks, phones and electronic records, since your emergency preparedness plan depends on it.

Wireless coverage

Wi-Fi needs a design based on the building's layout and materials, since walls, elevators and metal affect signals. Have a wireless survey done on the plan, and verify coverage after construction in resident rooms, corridors, therapy areas and outdoor spaces. Plan wired connections for access points in advance.

Specialty systems

Many building systems now use the network:

Nurse call, wander management and door access

Security cameras

Phones and overhead paging

Televisions and resident entertainment

Building controls such as heating and lighting

Identify vendors early and coordinate their requirements, including network connections, power and integration with your systems. Separate these devices onto their own network segments for security.

Internet and connectivity

Check whether the expansion requires more bandwidth, a backup connection or a new provider. Providers can take weeks or months to install circuits, so ask early. Confirm where the lines enter the building and where they terminate.

Protect operations during construction

Renovation can disrupt existing services. Plan how to keep systems running in occupied areas, label and protect existing cables, and avoid surprise outages during demolition. Dust and power interruptions can harm equipment, so plan for protection and scheduled downtime windows.

Schedule and inspection

Build technology milestones into the construction timeline: cabling before walls close, closet readiness before equipment installation and testing before occupancy. Walk through the work, test the cabling and collect documentation before final payment.

Budget and documentation

Include technology in the project budget from the beginning. After the project, update network diagrams, asset lists and as-built drawings so future work is easier.

Working with us

UnityCare IT reviews plans, specifies cabling and closets and coordinates network installation for healthcare and senior-living projects in Oklahoma, Texas and Arkansas.

Related service

An outsourced IT department with proactive maintenance and one number to call.

Related articles

Keep reading

Contact UnityCare Technologies

Call or text: 405-285-3845

New customers: start@unitycareit.com

Existing customers: support@unitycareit.com

Address: UnityCare Technologies, 2524 N Broadway Ste 554, PMB 947974, Edmond, Oklahoma 73034-4172