Temporary Networks During a Remodel: Keeping Units Online

On the Monday the contractor takes the ceiling down over the east hall, the data closet that feeds those rooms is also on the demolition list. Nobody mentioned it because the drawings showed a closet, not what was in it. By lunch, the nurses on that hall cannot open the charting system, the desk phone is dead, and a call light panel is showing an error.

Remodels do not break networks out of malice. They break them because the network is hidden behind the same walls the work is meant to open. Keeping units online takes a plan made before the first wall comes down.

Find out what runs through the work area

Start by learning what depends on the space being renovated. Walk it with your IT provider, your maintenance director and the contractor, and write down every system that passes through or terminates there.

Data cabling to resident rooms, the nurses' station and offices.

Phones, overhead paging and any wireless phone coverage.

Nurse call devices and the cabling or network links behind them.

Wi-Fi access points mounted on the ceiling.

Door access, cameras and fire alarm connections, some of which have their own rules and their own vendors.

The equipment closet itself, with its switches, patch panels and battery units.

Ask your nurse call and fire alarm vendors in writing what they need. Those systems are often life-safety related and rules about interruption can apply. Confirm requirements with your vendors and the relevant authority instead of assuming a temporary workaround is acceptable.

Decide what has to stay up, and for whom

Not everything must stay up the whole time. Some things can be down overnight, others not at all. Sort the list into what must be continuous, what can be interrupted for a short, scheduled window, and what can be down for the project's length.

Then decide where the affected residents and staff will be. If a hall is empty during construction, the network need is smaller. If residents remain in rooms while work happens beside them, you need nearly full service, and often extra attention to noise and dust.

Temporary pathways for cabling

The usual approach is to feed the affected area from somewhere that is not being demolished, then replace that connection with permanent cabling at the end.

Temporary cable runs may be laid along a corridor or through a safe ceiling, protected so staff and wheelchairs do not hit them. Anything in a path of travel needs to be secured so it is not a trip hazard, and your maintenance director should confirm it is acceptable.

A temporary closet or cart can hold a switch, powered through a protected circuit, to serve the area while the old closet is out of service.

Relocated equipment should be moved deliberately, with ports labeled before anything is unplugged so it goes back in the same order.

Temporary wireless coverage can serve areas where cabling is impractical, though it should be treated as a stopgap for charting convenience, not for devices that need a steady wired link.

Power is part of this. A relocated switch needs a circuit that will not be switched off by the electrician working nearby. Label the outlet and tell the crew.

Schedule cutovers, not surprises

Every move of a service from the old path to the temporary one is a cutover. Plan each as a short event with a time, an owner and a way back.

Pick a low-activity window and announce it to the nurse manager and to the shift leaders.

Have paper downtime procedures ready on the unit, because if the move takes longer than planned, charting must continue on paper.

Test the new path before removing the old one wherever possible.

Have someone physically present who can check a few rooms and a workstation afterward.

Record what was moved, with photos of the closet before and after.

The same drill applies at the end of the project, when permanent cabling replaces the temporary setup.

Communicate with the people on the floor

Tell nursing, therapy, the business office and the front desk what will change and when. A short note posted at the nurses' station, with a number to call after hours, saves many guesses at 2 a.m. when someone cannot sign into the system. Put the number on the same page as the downtime procedures.

After the walls close

Before the contractor demobilizes, test every outlet in the renovated area, run the certification checks described in your contract, and update the closet labeling and drawings. Remove temporary cables and equipment only after the permanent path is verified.

How we can help

UnityCare IT plans temporary network paths with your administrator and contractor before demolition, and handles the cutovers on-site or remotely, including after-hours moves. Our help desk with 24/7 after-hours support is available if something misbehaves on the first shift after a change.

Related service

Wi-Fi, switching, firewalls and internet that hold up across a whole facility.

Related articles

Keep reading

Contact UnityCare Technologies

Call or text: 405-285-3845

New customers: start@unitycareit.com

Existing customers: support@unitycareit.com

Service area: based in Edmond, Oklahoma, serving Oklahoma, Texas and Kansas

Hours: Mon–Fri 8 AM–5 PM CT; 24/7 after-hours support